i1Aihw9.png

Clients & Portfolio

Select Clients & Portfolio

 

Private Development

Wilhite Langley

Ed Grush

Eleven Western Builders

Stronghold Engineering

YMCA of Greater Whittier

Souza & Souza Construction

Crosno Construction

Desert First, LLC

Pacific Dental


Litigation & Forensic Engineering

The Brandi Law Firm

Girardi | Keese Lawyers

Law Offices of Kruger & Wong

The Cochran Firm

Panish, Shea, & Boyle LLP

Gordon Mckernan Injury Attorneys

Graves & King

Law Offices of H. Bryan Card

Gauthier Amedee Law

Hawaii Accident Law Center


Public Development

City of San Bernardino Department of Public Works

San Bernardino Municipal Water Department

City of Perris

CAlifornia state Polytechnic University Pomona

CAlifornia Department of Parks & Recreation

 
IMG_0120.JPG

Cal State Polytechnic University Pomona

Design modifications to the parking structure and lots to meet ADA compliance standards

To support student and faculty parking needs during the construction of a new parking structure, EES designed modifications to the existing parking structure and exterior parking lots to bring the campus closer to compliance with the current Americans with Disabilities Act Accessibility Guidelines (ADAAG). The project required topographic surveys of the existing lots and accessible pathways. EES reconfigured the existing stalls and provided design documents for the construction of new curb ramps and pathway modifications in order to maximize the available parking while still complying with the ADAAG.

 
20190724_123818.jpg

Traffic Signal

Design

& Installation

San Bernardino Municipal Water Department

In 2015, EES provided comprehensive design services for the installation of a new traffic signal at the intersection of Chandler Place at “E” Street in the City of San Bernardino. The project owner was the San Bernardino Municipal Water Department and EES’ scope of work included the plans, specifications, and estimates for the project. The traffic signal design accommodated dedicated lanes for Omnitrans’ new sBX bus line and provisions for custom signal heads for the transit buses. Surveying services were also contracted to EES, which included a design topographic survey and utility mapping from atlas records and field observations.

 
IMG_0145.JPG

Cal State Polytechnic University Pomona

Redesign of pedestrian walkways and parking lot areas on the Cal-Poly campus for ADA compliance

Projects included the redesign of pedestrian walkways and parking lot areas on the California Polytechnic University Pomona campus for ADA compliance. Our assignment was to prepare PS&Es for several projects that are part of an ongoing effort by Cal-Poly to improve campus accessibility for disabled students, faculty, and visitors. The services provided included topographic surveys; ADA evaluations of existing features; design plans for ADA compliant walkways, ramps, parking lots, and other features; quantity calculations and estimates; and demolition plans.

 
20190724_125447.jpg

Traffic Signal Modification

San Bernardino Economic Redevelopment Agency

EES was contracted to modify the traffic signal at the intersection of Mount Vernon and 5th Street in San Bernardino, CA. SBRDA was dissolved by the Governor of California since the time of this project; however, the project was closely supervised by the San Bernardino Department of Public Works.

 
IMG_0151.JPG

Cal State Polytechnic University Pomona

Utility mapping and topographic surveys for construction support

EES provided utility mapping and topographic surveying services to support the construction of a new Rose Parade Float Building on the campus of Cal-Poly Pomona. The project included using utility records and maps from the 1960's to assist in the location of MWD water lines as well as local storm drains and other utilities on the site of the new building.

 
IMG_0123.JPG

Cal State Polytechnic University Pomona

Design services for new parking lot construction and design modifications to existing traffic controls

EES was contracted to provide design services for the construction of a new parking lot at the intersection of Valley Blvd at Kellogg Dr in the City of Pomona. The contract also included the design of modifications to existing traffic control on Kellogg Dr to support the new lot and bring the facility into compliance with the 2016 CA MUTCD. EES services, which included the design topographic survey, construction staking, and PS&Es, could not begin until after Cal-Poly's Spring Quarter, and were completed in time for construction of the new lot to be finished before the start of the Fall Quarter.